This Construction Engineering and Inspection project consisted of resurfacing and safety improvements on I-95. The project started at the Baldwin Bridge in Old Saybrook and terminated at Interchange 72 in East Lyme (Rocky Neck Connector in Old Lyme) for a total of 5.5 miles. This project included milling and overlay of the entire project limits, installation of a concrete median barrier curb, upgrading the existing guiderail, and bridge safety-related improvements.

The project tasks included, but were not limited to:

  • Clearing and grubbing, including selected on-site disposal areas.
  • Sedimentation control at all cross-drain outlets, including seven (7) Environmental Sensitive Areas.
  • Widening of I-95 to provide work zone protection using barriers.
  • Installation of a permanent median and bridge protective barrier.
  • Upgrade of existing highway drainage.
  • All construction survey verification.
  • Concrete pavement repair.
  • Milling and paving in stages, utilizing HMA.
  • Milling and paving the Baldwin Bridge utilizing thin-lift PMA.
  • Providing information as directed by the Project Engineer and all controls for relocations and installations.
  • Temporary and permanent pavement marking.
  • Inspection of all construction activities.
  • All on-the-job testing and sampling of materials as specified.
  • The performance of all necessary field density tests.
  • Coordination and implementation of all engineering, technical, and administrative determinations.
  • Investigating and facilitating resolutions to technical problems or design issues.